Uinta Basin, Utah
Back to All Projects CASE STUDY: Uintah basin, utah About the Project This project was composted of 2 6″ diameter pipelines spanning approximately 3.6km total. The line was new with sections showing mill-scale from their manufacturing process. There were multiple 2″ and 3″ T’s present that were plugged with steel tubes welded to flanges. Our […]
North Eastern AB
Back to All Projects CASE STUDY: North western ab About the Project EnerClear has partnered with a large oil and gas producer to coat over 35 sections of line across North Western Alberta and North Eastern British Columbia. This work has included a mix of existing oil, gas, and water lines as well as new […]
Dawson Creek, BC
Back to All Projects CASE STUDY: Dawson Creek, AB About the Project EnerClear was engaged in this project following a concerning situation where multiple high-density polyethylene liner collapses had resulted in trapped pipeline pigs. After consulting with EnerClear, the owner elected to protect the existing pipeline from further corrosion using our method. Once the liner […]