CASE STUDY:

Uintah basin, utah

About the Project

This project was composted of 2 6″ diameter pipelines spanning approximately 3.6km total. The line was new with sections showing mill-scale from their manufacturing process. There were multiple 2″ and 3″ T’s present that were plugged with steel tubes welded to flanges. Our team spent 20 days cleaning and coating both pipelines. 

Stats

Project Gallery